By Wesley Owen, Florida broker · November 13, 2026 · 7 min read
Florida Condo SIRS and Milestone Deadline: What Agents Check Now
Florida's December 31, 2026 SIRS and milestone inspection deadline is weeks away. Here are the rules, the latest condo market figures and a checklist for every condo listing and purchase.
Florida's condo safety laws have been in force for a few years now. For 2026 the date that matters is December 31, 2026. Under the 2025 rewrite (HB 913), that is the last day an association can finish its structural integrity reserve study (SIRS) if it was allowed to do the study together with a milestone inspection. That date is about seven weeks away, and buyers and lenders know it, so many condo files will turn on what the association has finished and what it hasn't.
This guide covers the rules, the latest Florida condo market figures and a checklist you can use on your next condo listing or purchase.
The two reports, in plain English
Milestone inspection (MI). This is a structural check of the building by a licensed engineer or architect. The Florida DBPR condo resource site says it is required when a building reaches 30 years of age and every 10 years after that. A local building department can start the clock at 25 years if it decides local conditions call for it. Proximity to salt water is the usual example. The 25-year trigger isn't automatic statewide, so check with the city or county where the building sits.
Structural integrity reserve study (SIRS). This is a reserve study focused on the building's key structural parts. It shows how much the association needs to set aside to repair and replace them. DBPR says residential condominium associations with buildings three or more habitable stories tall need a SIRS at least every 10 years.
The practical difference for your client: the milestone inspection tells you whether the building has a problem today. The SIRS tells you how much owners should be paying into reserves to keep it sound. Both can mean higher assessments.
The key dates and figures
| Item | Rule or figure | Source |
|---|---|---|
| Milestone inspection trigger | 30 years of age, then every 10 years (25 years if the local agency requires) | DBPR condo inspections page |
| Buildings covered by SIRS | Residential condos with 3+ habitable stories | DBPR; HB 913 (2025) |
| General SIRS deadline (associations existing on or before July 1, 2022) | December 31, 2025 | HB 913 staff analysis; DBPR |
| SIRS done together with a milestone inspection due by 12/31/2026 | Must be completed by December 31, 2026 | DBPR condo inspections page |
| SIRS update cycle | At least every 10 years | DBPR |
| "Other items" threshold in the SIRS | Raised from $10,000 to $25,000, inflation-adjusted yearly | HB 913 summaries |
| 2026 inflation-adjusted threshold | $25,675 (as reported from DBPR's figure) | Industry summaries citing DBPR |
HB 913 also made other changes, including new rules on using special assessments, lines of credit and loans to fund reserves. If your buyer's association is relying on one of these, have them read the association's documents with a Florida attorney.
How many buildings are behind?
Nobody publishes one official statewide compliance rate, but two data points show the size of the gap:
- Miami-Dade: MIAMI REALTORS reported a SIRS compliance rate of 47.6% among Miami-Dade condominiums as of Feb. 24, 2025. Its count compared 1,653 condos that reported being three or more stories tall with 787 associations in the SIRS database.
- Statewide: An independent site that cross-checks public records found DBPR's SIRS database lists a study for at least 2,659 of 9,263 older condo communities with 25 or more units, about 29%. That is a third-party analysis, not an official DBPR figure. Some studies may also be done but not yet filed.
The takeaway: don't assume a building is compliant because it looks well kept. Ask for the reports.
What the condo market looks like right now
These rules are landing on a market with plenty of choice for buyers. Here are the latest statewide Florida Realtors figures for existing condos and townhouses:
| Metric | Condo-townhouse | Single-family (for comparison) |
|---|---|---|
| September 2026 median sale price | $293,500 (down about 1.8% year over year) | $415,000 |
| September 2026 closed sales | 7,179 (down 0.1%) | Down 3.5% |
| September 2026 cash sales | 3,765, about 52.4% of closings | n/a |
| 3Q 2026 median price | $295,000 (unchanged) | n/a |
| 3Q 2026 closed sales change | Up 3.1% | Up 0.2% |
| Months' supply, September and 3Q 2026 | 7.7 months | 4.4 months |
| Months' supply, 2Q 2026 | 8.1 months | 4.5 months |
| Months' supply, April 2026 | 8.9 months | 4.7 months |
Condo supply has come down from the spring, but it is still well above single-family supply. More than half of condo closings are cash. Some of that reflects lenders being cautious about buildings with open structural or reserve issues. The better a seller's paperwork, the easier the listing is to sell.
Listing a condo: what to gather before you go live
Ask the seller, or the association through the seller, for these items before the listing appears in the MLS:
- Building age and certificate of occupancy date. This tells you whether a milestone inspection is due, and whether the local 25-year rule may apply.
- Milestone inspection status. Has Phase 1 been done? Did the engineer call for a Phase 2? Are repairs under way?
- SIRS status. Is it finished, and is it on file? Is the association funding reserves at the level the study calls for?
- Current budget and any special assessments, whether adopted or proposed, with amounts and due dates.
- Board minutes from the last 12 months. Proposed assessments, repair bids and loan discussions often show up here before anyone formally discloses them.
- Insurance summary for the association's master policy. This matters for both the buyer's lender and the buyer's budget.
If the association hasn't finished its SIRS or milestone inspection, don't guess what that means for the sale. Write down what you learned and who told you, and tell the seller to talk with their attorney about what has to be disclosed.
Representing a condo buyer: questions to ask
Section 718.503, Florida Statutes, lists the association documents a seller has to give a resale buyer. After the post-Surfside laws, that list includes inspection and reserve study information where it applies. The buyer has a limited window after receiving the documents to review them and cancel. Check the exact period in the current statute and the contract form you're using, and put that deadline on the calendar as soon as the documents are delivered.
While the buyer reviews the documents, help them ask:
- Has the milestone inspection been done? If so, what did it find, and are the recommended repairs funded?
- Was the SIRS finished by its deadline? Does the current budget fully fund the SIRS reserve items?
- Is a special assessment planned, or is the association borrowing for repairs? Who pays: the seller or the buyer?
- Will the buyer's lender approve the building? Have the loan officer check condo project eligibility early, not in week three.
- How much does the monthly HOA fee add to the buyer's housing payment once full reserves are funded?
A simple habit helps: put the association's figures (current dues, any special assessments and the reserve funding level) next to the buyer's loan estimate. Buyers make better decisions when they can see the full monthly cost.
A broker's file checklist for condo deals
Use this on every condo file before you approve it for closing:
- [ ] The building's age and milestone inspection status are noted in the file
- [ ] The SIRS status is noted, with the date it was completed or a note that it hasn't been
- [ ] The association document package was delivered, with the delivery date recorded
- [ ] The buyer's review and cancellation deadline was calculated and calendared
- [ ] Any special assessment is addressed in the contract, saying who pays
- [ ] The lender confirmed the condo project is eligible (or the deal is cash)
- [ ] All required disclosures are signed and in the file
- [ ] Any open questions about the association's documents were referred to an attorney, and the referral is noted
In the next few weeks, sort your active condo listings and pending condo deals by building age. Any building that turns 30 (or 25 locally) around now is the most likely to have work due by December 31, 2026, so call those associations first.
If you track deadlines in one place, add the document delivery date and the buyer's cancellation date the same day the documents arrive. Parcel's deadline view is one way to see those dates across every condo deal in your office.
The bottom line
When a condo buyer finds out about a structural or reserve problem only after closing, the agent's file is the first thing anyone looks at. Asking early for the milestone inspection, the SIRS and the budget protects your client, your license and the deal.
This article is general information, not legal or tax advice. Condo laws changed in 2022, 2024 and 2025, and more changes are possible. Confirm current requirements with your broker, a Florida real estate attorney or a CPA before you rely on them in a transaction.
Sources
- Inspections - DBPR Condominium Information & Resources
- HB 913 (2025) Final Bill Analysis, Florida House of Representatives
- What HB 913 Means for Your Condo Association in 2026 (CSI Design)
- Florida Condo Reserve Funding Requirements in 2026 (ReservesPro)
- Condos - MIAMI REALTORS
- Florida Condo Milestone Inspection and SIRS Status (CondoDueDate)
- Florida housing market holds steady in September - Florida Realtors
- Florida condo sales rise 3.1% in third quarter - Florida Realtors
- Fla.'s Housing Market Continues Recent Trends in Sept. and 3Q 2026 - Florida Realtors
- Florida home sales gain momentum, extend growth streak to 10 months - Florida Realtors
- Fla.'s Housing Market: Closed and New Pending Sales Rise in April - Florida Realtors
- Market News (Florida condo cash sales share, September 2026)
This article is general information, not legal, tax or financial advice. Confirm the details with your broker, attorney or CPA.
Keep reading
- Florida Property Tax Prorations at Closing: November to March Guide
2026 Florida property tax bills are out and the 4% early-payment discount is running. This guide explains how tax prorations work on a closing between November and March, with worked examples and a checklist.
- Florida HOA and Condo Estoppel Certificates: Fees, Timing, Checklist
Florida HOA and condo estoppel certificates come with set fee caps, a 10-business-day delivery deadline and a 30-day shelf life. Here are the numbers, worked fee examples and a timing checklist for agents.
- Florida Closing Wire Fraud: 2025 FBI Data and an Agent Checklist
FBI data shows reported real estate fraud losses jumped to $275.1 million in 2025. Here's what that means for Florida closings, and a practical anti-wire-fraud checklist agents and brokers can start using on every file today.